Experienced industry design experts
Wide range of engineering services
Outstanding delivery of quality facilities

CJSC JBK-TADES and CJSC Plant JBK-NUREK manufacture reinforced concrete poles and structures for the construction of networks of power lines and substations, ready-mixed concrete, inert and non-metallic materials.

CJSC RSU-TADES was established in 1987. CJSC RSU-TADES specializes in construction and assembly operations, as well as overhaul and maintenance of hydropower facilities located in the Republic of Tajikistan. The subsidiary is located in Karamov Street in Dushanbe.
Mechanical Unit 1 was established in 1938; its main activities include repair and construction of substations and power lines, preparation of construction sites, excavation works, installation of external and internal networks and equipment, as well as commissioning.

CJSC Badakhshan-TADES (Khorog) builds power lines and substations in the Gorno-Badakhshan Autonomous Region.

CJSC SUGD-TADES is located in the city of Khujand. The subsidiary builds and assembles 0.4 and 10 kV overhead power lines and cable lines, as well as 10/0.4 kV consumer substations in rural areas and urban settlements, as well as 35 and 110 kV overhead power lines and 110/35/10 kV transformer substations.

The Design and Research Institute Tajikenergoproject, established in 1963, performs design of power lines and 0.4-220 kV substations, including geological and geodetic engineering survey, develops utilities diagrams for settlements and territories, specifically in heat supply, power supply, communication, alarm and warning systems, and executes respective estimate documentation. The enterprise is located in the Tsentralny district of Dushanbe.