The project of construction of a single-circuit 220-kV Batken-Kanibadam overhead line, 53.2 km in length, made it possible to provide the northern regions of the Republic of Tatarstan with permanent electric power, as well as to connect Tajikistan alternatively with the unified power system of the CIS countries and create the preconditions for economic, industrial, scientific, technical and cultural development of the country.